Home Feature Presentation Investment News Recommendations Investment Projects Highlights
Environmental Products Investment Climate Information Services Spotlight Western China Site Map Chinese







Investment guide

 

Personnel expenses

Item

Fee standard

Salary level

Ordinary staff : 450-1,500 yuan

Executives: 1,000-5,000 yuan

Social insurance

Type of insurance

Ratio borne by employer

Ratio borne by individual

Total

Pension insurance (%)

10

6

16

Unemployment insurance (%)

1

1

2

Industrial injury insurance (%)

0.5-1.5

 

0.5-1.5

Medical insurance (%)

7

2

9

Birth insurance (%)

0.5

 

0.5

 

 

Registration fee for enterprise

Items

Fee standards

Items

Newly established enterprises

Change of enterprises

Branches

Joint registration

Code for organization & institution

53 yuan

53 yuan

53 yuan

Making official seal

150 yuan/piece

150 yuan/piece

150 yuan/piece

State taxation registration

35 yuan

15 yuan

35 yuan

Local taxation registration

35 yuan

15 yuan

35 yuan

Financial registration

Blank

Blank

50 yuan

Statistics registration

35 yuan

15 yuan

Blank

Registration for commerce and industry

Registry for opening business

For those with a registered capital of 10 million yuan or below, at a rate of 0.8ˇë; for the portion exceeding 10 million yuan, at a rate of 0.4ˇë; for the portion exceeding 100 million yuan, no charge

300 yuan

Announcement fee

400 yuan

300 yuan, and fee for change 100 yuan

400 yuan

Production cost

40 yuan

50 yuan

70 yuan

Contract verification fee

1ˇë of the total amount of contract (minimum 40 yuan, maximum 3,000 yuan)

 

 

Taxation 

Local income taxes of enterprise

The preferential rate for foreign invested enterprises is 15% and it can be treated with two-year exemption and three-year half reduction.

City construction tax

Exempted

Education surtax

Exempted

Real estate tax

Original value of real estate (1-30%)ˇÁ1.2% (Exempted in the first three years.)

Personal income tax

Personal income tax: Personal above 1,400 yuan, per month for local employees above 4,000 yuan per month for overseas employees. The tax rate is 5-4.5%.

Value-added tax

17%

Commodity inspection fee

Goods valueˇÁ0.25%ˇÁ70%

Quarantine and inspection fee

Bulk goods 0.5-1 yuan/ton

Container 40 yuan/20 ft; 80 yuan/40 ft

Charge for waste discharge

Charge for conformity discharge

0.05 yuan/ton

Charge for discharge exceeding criteria

Pollutants/exceeding the criteria

0.18 yuan/ton

Pollutants exceeding the criteria

0.05 yuan/ton+2600 yuan

 

 

Electricity fee

Type of electricity use

Preferential electrical fees in economic function zones

Electrical fees in common areas

Large-scale industries

(1) Basic electricity fee

9.00 yuan/KVA. Per month based on transformer capacity, or 13.50 yuan/KW. Per month based on maximum demand

9.00 yuan/KVA. Per month based on transformer capacity, or 13.50 yuan/KW. Per month based on maximum demand

(2) Electrical fee

0.542 yuan for consumption of less than 1 KVA, 0.542 yuan for 35-100KVA, 0.542 yuan for over 220 KVA

0.568 yuan
0.558 yuan
0.548 yuan

Electrical fees for common industries and non-industries

0.730 yuan for consumption of less than 1 KVA, 0.720 yuan for 1-10KVA, 0.710 yuan for 35 KVA or above

0.730 yuan
0.720 yuan
0.710 yuan

Electrical fees for commercial use

0.92 yuan for consumption of less than 1 KVA, 0.910 yuan for 1-10KVA, 0.9 yuan for 35 KVA or above

0.92 yuan
0.91 yuan
0.90 yuan

Electrical fees for irrigation and drainage in crop fields

0.357 yuan

0.357 yuan

 

 

Water charge

Types of users

Calculating unit

Price (yuan)

Land for industrial use

High-tech Technology Development Zone

m3

1.18

Zhuhai Free Trade Zone

m3

1.18

Zhuhai Harbor Industrial Zone

m3

1.18

Industrial water in other zones

m3

1.45

Water for commercial institutions and groups

m3

1.52

Water for construction industry

m3

2.02

Water for catering industry

m3

2.17

Water for special trades

m3

3.5

Water by residents

m3

1.02

 

 

Land sales and factory building construction

Items

Standards of charge

Land price

1. Land price policies of financial subsidies are implemented. The concrete prices are determined according to the real situation of projects, including six connections and one leveling, and the 1:1 construction application fee for the land use right;

2. Water, electrical and various accessory facilities are within 50 meters from the land to be used;

Land royalty

Exempted

Line-laying fee

358 yuan/point (including red lines for the land to be used and red lines for construction)

Line-verifying fee

1066 yuan/building

Filing fee for fire-prevention construction

3 yuan/m2; charged according to building area

Quality inspection fee for project

Charged at the rate of 3.5%(the State specified standard) (Both parties can reach a preferential rate of charge through negotiation)

Supervision fee of project

Total cost of project

Charge rate (charged according to the percentage of the total cost of project)

Below 5 million yuan

2.5%

5-10 million yuan

2-2.5%

10-50 million yuan

1.4-2%

50-100 million yuan

1.2-1.4%

Over 100 million yuan

1%

The above are the standard charges specified by the State, and both parties can reach a preferential rate of charge through negotiation

Guaranty money for files

1% (not exceeding the maximum amount of 50,000 yuan)

Charge for noise

800-1,500 yuan/month (calculated according to the total amount of investment and time of construction)

Measurement fee for buildings

160 yuan (for less than 100m2, and 48 yuan for every additional 100 square meters)

Registration fee for property right

70 yuan

 



Copyright © China Internet Infomation Center. All Rights Reserved
E-mail:webmaster@china.org.cn Tel:86-10-88828088