|
Personnel expenses
|
Item |
Fee standard |
|
Salary level |
Ordinary staff : 450-1,500 yuan
Executives: 1,000-5,000 yuan |
|
Social insurance |
Type of insurance |
Ratio borne by employer |
Ratio borne by individual |
Total |
|
Pension insurance (%) |
10 |
6 |
16 |
|
Unemployment insurance (%) |
1 |
1 |
2 |
|
Industrial injury insurance (%) |
0.5-1.5 |
|
0.5-1.5 |
|
Medical insurance (%) |
7 |
2 |
9 |
|
Birth insurance (%) |
0.5 |
|
0.5 |
Registration fee for enterprise
|
Items |
Fee standards |
|
Items |
Newly established enterprises |
Change of enterprises |
Branches |
|
Joint registration |
Code for organization & institution |
53 yuan |
53 yuan |
53 yuan |
|
Making official seal |
150 yuan/piece |
150 yuan/piece |
150 yuan/piece |
|
State taxation registration |
35 yuan |
15 yuan |
35 yuan |
|
Local taxation registration |
35 yuan |
15 yuan |
35 yuan |
|
Financial registration |
Blank |
Blank |
50 yuan |
|
Statistics registration |
35 yuan |
15 yuan |
Blank |
|
Registration for commerce and industry |
Registry for opening business |
For those with a registered capital of 10 million yuan or below, at a rate of 0.8ˇë; for the portion exceeding 10 million yuan, at a rate of 0.4ˇë; for the portion exceeding 100 million yuan, no charge |
300 yuan |
|
Announcement fee |
400 yuan |
300 yuan, and fee for change 100 yuan |
400 yuan |
|
Production cost |
40 yuan |
50 yuan |
70 yuan |
|
Contract verification fee |
1ˇë of the total amount of contract (minimum 40 yuan, maximum 3,000 yuan) |
|
Taxation
|
Local income taxes of enterprise |
The preferential rate for foreign invested enterprises is 15% and it can be treated with two-year exemption and three-year half reduction. |
|
City construction tax |
Exempted |
|
Education surtax |
Exempted |
|
Real estate tax |
Original value of real estate (1-30%)ˇÁ1.2% (Exempted in the first three years.) |
|
Personal income tax |
Personal income tax: Personal above 1,400 yuan, per month for local employees above 4,000 yuan per month for overseas employees. The tax rate is 5-4.5%. |
|
Value-added tax |
17% |
|
Commodity inspection fee |
Goods valueˇÁ0.25%ˇÁ70% |
|
Quarantine and inspection fee |
Bulk goods 0.5-1 yuan/ton |
|
Container 40 yuan/20 ft; 80 yuan/40 ft |
|
Charge for waste discharge |
Charge for conformity discharge |
0.05 yuan/ton |
|
Charge for discharge exceeding criteria |
Pollutants/exceeding the criteria |
0.18 yuan/ton |
|
Pollutants exceeding the criteria |
0.05 yuan/ton+2600 yuan |
|
Electricity fee
|
Type of electricity use |
Preferential electrical fees in economic function zones |
Electrical fees in common areas |
|
Large-scale industries |
(1) Basic electricity fee |
9.00 yuan/KVA. Per month based on transformer capacity, or 13.50 yuan/KW. Per month based on maximum demand |
9.00 yuan/KVA. Per month based on transformer capacity, or 13.50 yuan/KW. Per month based on maximum demand |
|
(2) Electrical fee |
0.542 yuan for consumption of less than 1 KVA, 0.542 yuan for 35-100KVA, 0.542 yuan for over 220 KVA |
0.568 yuan 0.558 yuan 0.548 yuan |
|
Electrical fees for common industries and non-industries |
0.730 yuan for consumption of less than 1 KVA, 0.720 yuan for 1-10KVA, 0.710 yuan for 35 KVA or above |
0.730 yuan 0.720 yuan 0.710 yuan |
|
Electrical fees for commercial use |
0.92 yuan for consumption of less than 1 KVA, 0.910 yuan for 1-10KVA, 0.9 yuan for 35 KVA or above |
0.92 yuan 0.91 yuan 0.90 yuan |
|
Electrical fees for irrigation and drainage in crop fields |
0.357 yuan |
0.357 yuan |
Water charge
|
Types of users |
Calculating unit |
Price (yuan) |
|
Land for industrial use |
High-tech Technology Development Zone |
m3 |
1.18 |
|
Zhuhai Free Trade Zone |
m3 |
1.18 |
|
Zhuhai Harbor Industrial Zone |
m3 |
1.18 |
|
Industrial water in other zones |
m3 |
1.45 |
|
Water for commercial institutions and groups |
m3 |
1.52 |
|
Water for construction industry |
m3 |
2.02 |
|
Water for catering industry |
m3 |
2.17 |
|
Water for special trades |
m3 |
3.5 |
|
Water by residents |
m3 |
1.02 |
Land sales and factory building construction
|
Items |
Standards of charge |
|
Land price |
1. Land price policies of financial subsidies are implemented. The concrete prices are determined according to the real situation of projects, including six connections and one leveling, and the 1:1 construction application fee for the land use right;
2. Water, electrical and various accessory facilities are within 50 meters from the land to be used; |
|
Land royalty |
Exempted |
|
Line-laying fee |
358 yuan/point (including red lines for the land to be used and red lines for construction) |
|
Line-verifying fee |
1066 yuan/building |
|
Filing fee for fire-prevention construction |
3 yuan/m2; charged according to building area |
|
Quality inspection fee for project |
Charged at the rate of 3.5%(the State specified standard) (Both parties can reach a preferential rate of charge through negotiation) |
|
Supervision fee of project |
Total cost of project |
Charge rate (charged according to the percentage of the total cost of project) |
|
Below 5 million yuan |
2.5% |
|
5-10 million yuan |
2-2.5% |
|
10-50 million yuan |
1.4-2% |
|
50-100 million yuan |
1.2-1.4% |
|
Over 100 million yuan |
1% |
|
The above are the standard charges specified by the State, and both parties can reach a preferential rate of charge through negotiation |
|
Guaranty money for files |
1% (not exceeding the maximum amount of 50,000 yuan) |
|
Charge for noise |
800-1,500 yuan/month (calculated according to the total amount of investment and time of construction) |
|
Measurement fee for buildings |
160 yuan (for less than 100m2, and 48 yuan for every additional 100 square meters) |
|
Registration fee for property right |
70 yuan |
|